Offshore wind reference list

The Port of Thyboron has been used by the offshore wind industry in numerous ways since 2016. Below is a list of offshore wind farms for which the Port of Thyboron has been used for both installation tasks and O&M. The port is also used for mobilising offshore vessels and sometimes for layovers.

Energy island – installation in 2030

  • Geophysical surveys

Thor – installation in 2026

  • Geophysical surveys
  • Marine archaeology
  • UXO activities

Vesterhav Nord – installation in 2023

  • Geophysical surveys
  • Seabed preparation
  • Geological survey
  • Trafos - Heavy lift operation

Nissum Bredning Offshore Test Wind Farm – 7 MW offshore wind turbines, installed in 2017

  • Geophysical surveys
  • Seabed preparation
  • Geological survey
  • Dredging
  • Seabed preparation
  • Onshore storage of piles and jackets
  • Short-term floating storage of concrete TP´s and following main components tower, blade and nacelles.
  • Jacket installation
  • Transition piece installation
  • Wind turbine construction
  • Cable installation
  • O&M

Horns Rev 3 – Constructed in 2018

  • DP vessel
  • Seabed preparation work
Wind Turbine Discharging L1260929 Web
Wind Turbine Discharging L1260950 Web
Wind Turbine Discharging 0808 Web

Thor – Construction in 2026

Strill Explorer 1 Web
Floating Lidar Buoy 6214 Web
Cargo Transformer 4676

Vesterhav Nord – Construction in 2023

Seabed Excalibur 2196 Web
Freja 2000 Redi2 Web
Deep Helder 2 Web

Nissum Bredning Offshore Test Wind Farm

Jackets AS5I7796 Web
Offshore Matador 2801 Web
Offshore Wind Turbine 3025 Web
Nissum Bredning Vind brings offshore innovations to life
play video
Nissum Bredning Offshore Test Wind Farm
Nissum Bredning Vind brings offshore innovations to life