Søndre mole
Kaj 800 - Specially designed solution with direct pipeline to chemical manufacturer
Quay with direct pipeline to the FMC factory
Specially designed chemical bridge
There is a long tradition of unloading chemicals at the Port of Thyboron. The Cheminova chemical manufacturer (called EMC today) began unloading caustic soda back in the 1990s. A special solution was established in the form of a chemical bridge at the Søndre Mole quay, with a direct pipeline to the factory storage tank.
Optimised transport logistics
The unloading has since taken place without any extra handling, and FMC still receives caustic soda via the pipeline direct from the Port of Thyboron. Unloading takes place completely undisturbed in a dedicated area of the port. This is another good example of a tailor-made solution that optimises the customer’s transport logistics.
ISPS compliant quay
The quay is ISPS-compliant. Søndre Mole is closed when large tankers are being unloaded.
Technical Data - Søndre Mole
Berth number
- Berth 1
- 800
Navigation
- Water depth, m
- 8
- Port entrance corridor, m
- 75,8
- Currents, kn
- 0
Quay facility specifications
Dimensions
- Quay length, m
- 180
- Quay width, m
- 8
- Quay wall in m
- 2,10
Capacity
- Bearing capacity, t per m2
- Distributet pressure, t per m2
Type
- Quay type, Sheet pile wall
- ✓
- Surface type quay, asphalt
- ✓
- Capping beam type, concrete
- ✓
- ISPS
- ✓
History
- Construction year
- 1962 / 2014
Quay equipment
Supplies
- Wi-Fi, fiber connection
- ✓
- Bunkering from barge
- ✓
- Bunkering capacity l/min
- 70-80
Safety
- Safety ladders, quantity
- 4
- Safety point, quantity
- 2
Maritime equipment
- Fenders diametre, m
- 1,5
- Fenders width, m
- 0,55
- Bollard, quantity
- Bollard type, bean
- 3
- Bollard swl, capacity, t
- 30