Trawl-stretching facility Sydhalen
Trawl stretching with an easy overview
The trawl-stretching facility at Sydhalen can service even the largest trawls and Dutch transit fishing vessels
As fishing vessels increase in size, trawls also get bigger.
The large trawl-stretching facility at Sydhalen at the Port of Thyboron offer lots of space, making the work of trawl makers more efficient and flexible.
The trawl-stretching facility is so large that it saves a lot of unnecessary handling and offers an exceptional overview.
Facilities for efficient trawl repairs
The trawl-stretching facility has been placed in an area of the port where seine makers can work undisrupted.
The 500-metre long trawl-stretching facility allows the entire trawl to be spread out on the asphalt, so that seine makers can avoid unnecessary handling like having to move the trawl around during repair. It also offers an exceptional overview of the large trawls.
Bollards at each end
The trawl-stretching facility has two 20-tonne SWL bollards at each end. The large, heavy trawls can be attached here and pulled out by trucks (for which there is easy access to the area).
Working light at the trawl-stretching facility
The facility has LED lighting every 75 metres, so there is light for working during the early mornings and late evenings in the winter half year. The facilities thus help to ensure a rapid response, 24/7/365.
Comfort and good working conditions
To protect the seine makers from the west wind, the trawl-stretching facility has an embankment that provides shelter.
Good access conditions for trucks
Lots of space and unobstructed vision allows easy truck manoeuvring at the facility.
Technical Data - Trawl-stretching facility Sydhalen
Dimensions
- Trawlstretch, length, m
- 500
- Trawlstretch, width, m
- 25
Maritime equipment
- Bollard, quantity
- 4
- Bollard swl, capacity, t
- 20
History
- Construction year
- 2018
Supplies
- Power stations on quay
- 2
- LED lightning, numbers
- 6